Attaching Bare Copper Ground To Floor Joists
Tube at right angles or diagonal to the joists may be installed through holes drilled through the center of the joists.
Attaching bare copper ground to floor joists. Tom of floor joists is to eliminate the temp tation to use the 12 2 wire for your kitchen gfi as a place to hang laundry. Remember where the wall supporting the joists is over 3m long special restraint type hangers to bs 5628. Joists must be accurately cut to length the maximum overall tolerance is 6mm. I m tempted to use simple copper straps to affix the pipes to the joists themselves.
Nm cable installed on the wall of an unfinished. Smaller cables shall be run either through bored holes in joists or on running boards. Cable is run at angles with joists in unfinished basements and crawl spaces it shall be permissible to secure cables not smaller than two 6 awg or three 8 awg conductors directly to the lower edges of the joists. These holes should be at least 1 times the o d.
Because a ground rod is so long it can be hard to get leverage on the top of it when you start installing it. To get the top down to a more manageable level dig a hole 2 4 feet 0 61 1 22 m deep. I would like to install pipe parallel to the floor joists in my basement and then conceal it behind drywall. Cut a 2 by 4 plank for each joist location to the measured room width using a circular saw.
I need to do this with both gas black iron and domestic water copper pipe. Perpendicular wires are mostly stapled to each joist and hanging freely between but sometimes stapled to a board. Begin by purchasing two copper coated steel ground rods step 2 drill a 5 16 hole in the rim joist of your house as close as practical to the main service panel to the outside of the house above the ground level at least 6. Part 1 are required at a maximum of 2m centres to provide lateral restraint to the wall itself.
Copper tube running parallel to the floor joists should be fastened to the center of the vertical face of the joist with clips not more than 6 feet apart. Parallel wires are sometimes stapled to the edge of the joist and sometimes to the side but not generally as far as 19 mm 3 4 in from the edge. Current carrying wires are meant to support only their own weight. Make a plan to set the planks along the edges of the wall and then in 16 inch intervals between the two edge pieces.
If a lot of wires are already hanging from the bottom of the floor joists you can run the wires through raceways that fasten to the bottom of the joists. Divide the length by 16 inches to determine the number of floor joists needed for floor overage. Attaching an electric wire under a ceiling joist. Adding a new ceiling light direct wiring an attic fan or installing any other type of overhead electrical fixture requires access to electricity.