Attaching Metal Studs To Floor Joists
Attach the runner to the floor using wood screws when working on a plywood surface.
Attaching metal studs to floor joists. As per those examples below you can use a wood sill plate fix to the steel beam and fix the hangers to that sill plate supporting the joists. On the floor lay out the position of the wall and snap chalk lines to mark the wall s edges. Bolts should be completely threaded. Working with steel studs requires a few special tools.
Insert the proper phillips head drill bit into the drill. As illustrated here steel beams with wood filler require top mount or face mount hangers to attach to the triforce open joist. Installing metal studs metal studs come in the same dimensions as lumber. The tracks are installed first fastened to the floor and the ceiling in the case of a basement to the slab using concrete screws and to the ceiling joists.
Pan head or flathead screws provide the best holding power. On a finished ceiling where the stud wall framing track runs perpendicular to the joists fasten the track to the underlying joists with 1 1 2 in. Do the same thing on the other side of the stud wall and on both sides of the ceiling track. Tools for installing metal studs the basics include a tape measure chalk box laser level or plumb bob and magnetic level.
The system consists of two main components the track and the stud. Attach structural steel mezzanine platform to steel studs in new construction 11 22 2019 01 14 pm for an an existing building with fireproof construction and steel studs the floor to floor height is 12 and we framing partitions with 12 studs. Purchase steel plates also. Hand clamps and c clamps are useful while metal snips a chop box or circular saw are needed for cutting.
Cut the runner at the edge of door openings. Drill guide holes to slide the bolts through the wood into the steel frame. Step 1 rent or purchase the right tools. Metal cut off saw fasteners a hammer drill screw gun chalk box level laser level or plumb bob 1 x research source clampsstep 2 determine the number of steel studs needed.
The use of top mount hangers can be done in certain conditions. On the floor lay out and mark the location of the wall fasten the steel track photo 2 and then locate the position of the ceiling track using a plumb bob or a level held against a steel stud. Measure the piece of wood and line it up next to the metal stud to verify that it will fit properly. Bolt the piece of wood to the steel frame by pre cutting holes into the frame so the bolts can fit through.
Use bolts made specifically for screwing into steel or metal if attaching wood flush onto a steel frame. You should typically allow for 1 stud per every 12 inches 300 mm of linear wall space. You can typically get the best equipment for this at local construction rental stores.