Allure Flooring Subfloor Preparation
Second using a floor patching compound patch the lower areas if there is a large section that needs to be flattened use a self leveling compound.
Allure flooring subfloor preparation. Secure the plywood to the subfloor at 6 inch intervals with 1 inch deck screws placed along the edges. You can have these pieces cut by a lumber yard or use a circular saw on the job site. If you are installing vinyl flooring over an existing tile floor check that the grout lines are not larger than the quarter inch. Dramatic planks are quiet underfoot easy to maintain and offer state of the art click lock installation technology.
Trafficmaster allure can be installed over wood or concrete subfloors even over existing vinyl or tile flooring. You ll need to know how to level a floor. Apply floor patching compound to the joints. Clean clean the subfloor and floor thoroughly prior to installation.
Voids or humps in the sub floor will prevent allure from locking properly. Allure can be installed over most existing floors including wood vinyl linoleum ceramic tiles and concrete. Humps in the subfloor may also create bulging in your wood flooring later on. First place a long 8 level over the subfloor floor and mark any spots that are lower than also sand the high spots with a belt sander use 80 100 grit belts.
Just sand any high spots and fill the low spots with leveling compound. Multiply the length by the width and make an allowance of 10 to compensate for damaged and lost materials. Here s a step by step guide to help you prepare a wood subfloor for luxury vinyl. All subfloors must be sound solid and have little flexibility.
Cover your existing subfloor area where new vinyl flooring will be installed with 1 4 inch plywood. Subfloors should be flat within a tolerance of 1 8 3mm over a span of 4 feet. Allure ultra gives you the richness and beauty of real wood with luxurious embossing for a beautiful look and feel. Make sure to sit the flooring for about 48 hours to acclimate it to the area.
Measure carefully to ensure that the plywood is an appropriate fit. Tolerance is 3 16 over 8. Thoroughly vacuum the existing floor and use a long floor leveler and tape measure to ensure the subfloor is level within 3 16 inch for every 10 feet. If they are the floor will need to be leveled using a patching compound.
Set all screw heads slightly below the surface. Prepping subfloor for luxury vinyl flooring vinyl planks sheet vinyl peel stick vinyl. Any unevenness over 1 8 3mm must be sanded down or filled with a floor leveler. Ensure that all debris and dirt are not present.